
Electricity meters
For an AUX meter order, save the model code and technical description of the selected version. Single-phase, three-phase and DIN-rail meters need different connection details; confirm them with the supplier before purchase. We buy your selected devices without commission and pay the seller in yuan. In Guangzhou, we compare meter count, appearance and contents with your order and photograph the devices. We do not bench-test meter functionality. Quote upon request.

Delivery destinations
Our role in your shipment
Direct supplier procurement in China with zero purchasing commission
Receipt at our Guangzhou hub with complimentary photo verification for every order
Quantity and packaging integrity checks, plus protective wooden crating on request
We purchase and ship by postal and courier services; payment is due before dispatch. Cost and transit time are stated in the quote.
Sourcing tips
Ask the supplier for the wiring diagram, rated current and supported data transfer protocols of the exact model you selected.
For DIN-rail installation, confirm the housing width in modules and set contents; include the item code and device count in your enquiry.
Warehouse Inspection in Guangzhou for Electricity meters
What we inspect at the warehouse
- •We count the number of meters in the arrived box.
- •We verify the amperage and number of phases by the front panel of the device.
- •We inspect the plastic case for chips and cracks.
- •We photograph the meter display and the layout of the terminals.
- •Upon request, we will apply marketplace barcodes according to your file.
What is not inspected
We will not apply voltage, check energy accounting, or test communication interfaces.
Send product link — get a quote
Provide a product link from AUX. Our manager will calculate the exact landed cost to your destination.
Get an answer about your goods
Send a link or a short description and the destination country. We will check the best starting point for your route.
Sales team: sales@cargo-w69.com